The difference is the pad.
-
Speed
The foundation comes off the critical path weeks sooner, and every trade behind it starts sooner.
-
Predictability
The engineered pad, and its unknown cost, can drop out. A fixed four-box module means counts and crews are set before anyone mobilizes.
-
Performance
A stiff, two-way ribbed raft built with rebar or post-tension, designed to span expansive clay and other problem soils.
One form. One pour.
VBox units go down in four-box modules on a level subgrade, reinforcing goes in, and one monolithic pour creates a stiff, ribbed raft that spans soil that moves.
- 30″ × 30″
- Recycled-polypropylene forms, 10″ or 14″ high
- 1 pour
- Ribs, beams and a 4″ top slab, monolithic
- 2–3×
- Control joint spacing vs slab on grade
Installed across the USA, mainly in residential and light commercial construction on expansive clay.
Foundations are designed by the project's Engineer of Record to applicable code.