A raft over voids.
The forms leave voids under the slab and shape the concrete around them into a dense network of ribs, arches and beams, topped by a 4-inch slab. The finished raft spreads load across the whole footprint and lets expansive soil move beneath it.
- 14–18″ Above grade
- The top of slab sits above the ground and acts as a capillary break.
- 2-way Beam grid
- Beams run both directions, so the slab sits on the ground like a raft and spans soil that moves.
- No Presoak
- No soil presoaking before construction, a weather-sensitive step taken off the schedule.
The units and modules.
Each VBox unit is a 30-inch recycled-polypropylene form. Units go down in four-box modules on a fixed grid, ribs on five-foot centers, so the layout goes down the same way every time.
- Footprint
- 30″ × 30″
- Heights
- 10″ or 14″
- Module
- Four VBox units, 60″ square
- Rib spacing
- 5 ft on center
- Reinforcing
- Rebar or post-tension
- Material
- Recycled polypropylene
-
Walk-on
Strong enough for crews to walk on during installation.
-
Field-cuttable
Cut in place for utility penetrations.
-
Unaffected by water
Water does not affect the forms, on the ground or in the pour.
Four steps, one pour.
One pour. No separate footing pours. Crews set, reinforce and pour on a layout that repeats.
Set the forms
VBox units go down on the prepared grade in four-box modules, ribs on five-foot centers. Beam lines stay clear.
Beams and edges
Perimeter and interior beams form up as they normally would, full depth and full width at the form face.
Connect and reinforce
Bottom connectors lock the module and seat the lower mat on the rib lines. Top connectors carry the upper mat.
Pour
Concrete fills the ribs, beams and 4-inch top slab in one pour. The forms stay in place.
Drop the pad, and every trade after it moves up.
-
The change
Pad and foundation
The slab sits on prepared grade. The engineered pad of imported fill, placed, compacted and tested, can drop out.
-
Moves up
Forms and steel
Set in modules; rebar or post-tension lands on the rib lines.
-
Moves up
Pour
One monolithic pour on a layout fixed before the trucks are ordered.
-
Moves up
Vertical
Framing, steel or tilt panels start weeks earlier.
-
Moves up
Dry-in and MEP
Every milestone after the slab moves up.
See it go in.
Send us
the plan.
Tell us about your project and we'll show you how RPS fits it. Send your plans, PDF or CAD, with the project location, soil information and target schedule.
Request project pricingSite-specific foundation design by the project's Engineer of Record.