What is an RPS foundation?

A void-formed, reinforced concrete raft. Recycled-polypropylene RPS VBox units (void forms) are set on a level subgrade in four-box modules and connected, reinforcing is installed, and one monolithic pour creates beams in both directions under a top slab, usually 4 inches thick.

Who designs the foundation?

The project's Engineer of Record designs every RPS foundation in accordance with applicable codes. RPS supplies the forming system and can help your team evaluate fit.

How is an RPS slab designed and approved?

RPS VBox slabs are designed by the project's Engineer of Record with the ACI and post tensioned methodology engineers already use. Approval follows the normal path for the project.

Does it work with rebar and post-tension?

Yes. RPS VBox units support both rebar and post-tension designs.

How far apart can control joints be?

An RPS slab can allow control joints to be spaced two to three times farther apart, as the Engineer of Record determines. In one recent data center design, that eliminated more than four miles of control joints.

Soil

Which soils is RPS designed for?

Expansive, compressible and rocky soils.

Can we skip the engineered building pad?

In qualifying applications, yes. The stiff, ribbed raft can bear on prepared grade instead of 2 to 4 feet of engineered select fill. Your Engineer of Record makes that call for each project.

Do we need to presoak expansive soil?

No. The raft spans expansive soil and the voids beneath it allow the soil to move, so presoaking is not required.

Does the slab need a gravel or sand layer?

The top of an RPS slab sits 14 to 18 inches above grade and acts as an active capillary break, so it requires no gravel or sand.

Cost and schedule

How much does an RPS foundation cost?

In RPS modeling of a representative 20,000 SF building, RPS came in at $18 per square foot installed, against $18 to $21 for a traditional foundation with an engineered pad. Actual cost varies by project, region, soil and design, so send us your plans for project pricing.

How much faster is it?

In the same model, foundation to slab took 4 weeks with RPS against 7.5 weeks for traditional construction: the pad step drops out and the slab goes in one monolithic pour.

Why is the cost more predictable?

The engineered pad is the biggest unknown in a foundation budget, adding up to $3 per square foot depending on depth and fill. Where the pad drops out, that open-ended expense goes with it.

Construction

How is it installed?

Set the VBox units on prepared grade in four-box modules and connect them, form the perimeter and interior beams as you normally would, install the reinforcing, then pour once. One pour, with no separate footing pours.

Can crews walk on the forms?

Yes. The forms are strong enough for crews to walk on during installation.

What about utility penetrations?

Penetrations can be cut into the VBox units in the field.

Does weather hold up the job?

Water does not affect the forms.

Track record

Where has RPS been used?

RPS slabs have been installed across the USA, mainly in residential and light commercial construction on expansive clay.

Still have
a question?

Tell us about your project and we'll show you how RPS fits it. Send your plans, PDF or CAD, with the project location, soil information and target schedule.

Request project pricing

Site-specific foundation design by the project's Engineer of Record.