Where presoaking slows a multi-family job.
- Presoaking often goes deeper than on single-family pads because of larger foundation loads.
- Presoak water for a multi-family pad can reach hundreds of thousands of gallons, before evaporation.
- Engineers often require soaking 3 to 5 feet beyond the pad, 1.5 to 2 times the foundation area.
- Added cycle time and longer carrying costs while the pad soaks.
What an RPS slab changes.
- No Presoak
- The raft spans expansive soil instead of pre-swelling it, so presoaking is not required.
- 14–18″ Above grade
- The top of slab sits above grade and acts as a capillary break, with no gravel or sand layer.
- 1 Pour
- Beams run both directions under one monolithic pour, so the slab sits on the ground like a raft.
Illustrative figures from RPS modeling and technical briefs; actual results vary by project, region, soil and design. Foundations are designed by the project's Engineer of Record to applicable code.
Installed across the USA, mainly in residential and light commercial construction on expansive clay.
Send us
the plan.
Tell us about your project and we'll show you how RPS fits it. Send your plans, PDF or CAD, with the project location, soil information and target schedule.
Request project pricingSite-specific foundation design by the project's Engineer of Record.